Description
Dyness BF100-C100 is a complete outdoor air-cooled DC battery cabinet for commercial and industrial storage projects. The exact C100 configuration combines seven 280 Ah LFP packs with the control, thermal-management and cabinet safety systems required for 100 kWh nominal storage.
What the cabinet includes
The cabinet includes seven battery packs, a BDU with integrated BMS and EMS, air conditioning, touch display, internal switching and protection, multi-sensor detection, water-ingress detection, aerosol fire suppression and explosion-proof ventilation. It is a DC battery system: a compatible hybrid inverter or PCS that provides AC conversion is selected separately, together with external protection, cabling, foundation, grid studies, installation and commissioning.
Current BF100-C100 data
- Battery chemistry and capacity: LiFePO4, 280 Ah, 100 kWh nominal
- Pack configuration: seven 1P16S packs
- DC voltage range: 324.8 to 403.2 V
- Rated / maximum current: 140 / 160 A
- Depth of discharge: 95%
- Current datasheet dimensions: 725 x 1200 x 2260 mm
- Current datasheet weight: 1200 +/- 100 kg
- Ingress protection: IP55; corrosion class C3, optional C4
- Operating temperature: -20 to 50 C, with derating above 45 C
- Air conditioning: 2 kW cooling and 1 kW heating
- Noise: up to 65 dB; maximum elevation 3000 m with derating above 2000 m
- Communication: Ethernet, 4G and RS485
- Current listed inverter families: Solis, SOSEN, SOLINTEG and Megarevo; exact model and firmware must be approved
Performance and documentation
The current datasheet lists at least 8000 cycles / 10 years at 0.2C charge and discharge, 25 C and 95% DOD. This is a defined performance reference, not a standalone warranty promise. CE, LVD and UN38.3 are listed by the manufacturer; the exact project document set, cabinet nameplate and battery revision are confirmed before acceptance.
Outdoor siting, freight and commissioning
The approximately 1.2-tonne cabinet requires a professionally designed, drained and flood-aware foundation, sufficient load capacity, required fire clearances, ventilation and service access. The manual recommends raising the cabinet about 300-500 mm above ground and keeping it away from residential areas because of operating noise. Crane or suitable forklift handling, unloading, final freight, inverter/PCS selection, protection, grid approval and commissioning are quoted for the site. Do not treat this as consumer plug-and-play equipment.
Download the locally hosted official English datasheet and official English user manual. Browse complete battery systems.













Reviews
There are no reviews yet.