Store energy. Every way.™

BYD Battery-Box HV BCU + Base for HVB, HVS+ and HVM+ 16541149-00

14 990 Kč incl. VAT

Build the battery system around the correct original control or installation component and avoid preventable compatibility issues.BYD Battery-Box HV BCU + Base for HVB, HVS+ and HVM+ 16541149-00. Designed for the listed compatible battery families; we can verify the exact model and configuration before purchase.

In European supplier stock; exact 16541149-00 label, sealed scope, system generation, serial number, manufacture date and remaining warranty confirmed before order acceptance.

Compare

Description

BYD Battery-Box HV BCU + Base article 16541149-00 is the current control-and-base package for a compatible HVB, HVS+ or HVM+ high-voltage battery tower. The BCU controls and communicates with the battery system; the base supports the stack. Neither component stores energy.

Verified package scope

The official manual lists one BCU, one Base, terminal resistor, indoor and outdoor main-switch fasteners, two parallel-system communication terminals, wall-fixing hardware, a power-connector tool, two BCU power connectors, four adjustable feet, BCU and module hangers with fasteners, Quick Start Guide, Smart WiFi/LAN module and rubber plugs. WodaTherm™ confirms the sealed package, 16541149-00 label, serial number, manufacture date and remaining warranty before order acceptance.

Compatibility and dimensions

The current unit is intended only for documented HVB, HVS+ and HVM+ systems. It is not compatible with original Premium HVS/HVM modules and is not the separate HVS/HVM BCU 2.0 article 16448287-00. The BCU measures 610 × 157 × 282 mm and weighs 8.0 kg; the Base measures 610 × 110 × 282 mm and weighs 6.1 kg. Its adjustable feet provide an installed base height of approximately 110–130 mm.

  • Communication: CAN / RS485
  • Documented system protection: IP55
  • Installation: floor-standing
  • System family: HVB, HVS+ or HVM+; never mixed within a tower

Not included

Battery modules, inverter, external project cabling, electrical protection, design, installation and commissioning are separate. A qualified installer must verify the exact module count, inverter, firmware, parallel configuration, grounding, DC protection and current manufacturer instructions.

Download the locally hosted official English HVS+/HVM+ manual or the locally hosted official English HVB manual. Browse battery accessories.

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

0
0
Your Cart
Your cart is emptyReturn to Shop